When a system goes down, it is often not in the state the architecture diagram shows. It is in a temporary state left by maintenance, an upgrade or a failover. What high availability really needs reviewed is how much protection is left during that time.

Early on 20 October, London time, an entire zone of Google Cloud’s London region, europe-west2, lost power. Google’s incident report, published on 4 November, describes the sequence in detail, and Computer Weekly’s report on 11 November summarised the impact: more than 35 cloud services affected, with banks, courts and couriers among those downstream. About three weeks later, on 12 November, Microsoft 365 suffered a broad outage. Problems with Outlook, Teams and other services continued into 13 November, and Microsoft said on 14 November that it had restored service to the remaining customers and regions.

The technical details of the two incidents have nothing in common. At Google, the site was clearly in a temporary state left by maintenance; Microsoft has only a preliminary account so far, and it points to a state left behind by an earlier change. What stayed with me after reading both was the same thing: at the moment of failure, neither system was still in the state its design assumed.

The design was 2N; that week it was 1N

The facility’s power was designed as 2N: two independent utility feeds, about five minutes of UPS battery, and a generator plant started automatically by a controller (PLC). A quarterly generator load test on 14 October found problems, the breaker on utility feed B was opened for repairs, and the site went into what the report calls a “temporary single-feed (1N) bridged maintenance posture”.

On 20 October, feed A, the only feed in use, failed because of an underground cable fault outside the site. By design, the generators should have taken over before the batteries ran out. But the controller measured voltage upstream of the feed B breaker, and that stretch of cable was still live. The controller concluded that utility power was healthy and never sent a start signal. The active and standby controllers ran the same logic and read the same sensors, so they were wrong together. When the on-site team tried to transfer the load through the controller, the same reading blocked them. The UPS held until the batteries were exhausted, and the data halls went dark.

That sensing flaw had no consequence while both feeds were in service. It only became fatal in the temporary state where feed B was disconnected but still energised upstream. The risk was not in the design itself. It was in the gap between the design and the state the system was actually in.

A problem left by one change can wait for the next change to appear

As of 15 November, Microsoft has not yet published its full post-incident report; there is only a preliminary explanation. In a statement on 13 November, it said the problem was introduced during an earlier network capacity upgrade and surfaced after a recent network change. During the incident, large numbers of servers failed automated health checks and dropped out of service, overloading the machines that remained; servers brought back online could become unresponsive again as soon as traffic reached them.

The root cause will have to wait for the report, but the explanation alone is worth noting. If that account holds, an upgrade was completed, yet some state it left behind stayed in the system until a seemingly unrelated change brought it to the surface. If change review looks at each change on its own, a link that spans two changes is very hard to see.

The side that takes over is working from the same assumptions

There is another temporary state that tends to be overlooked: the period after a failover. In Google’s case, automated failover moved work to the other two zones in the region, and the influx of compute, database failovers and cross-zone calls filled the remaining capacity, causing queues and 500 and 503 errors across the region. Computer Weekly noted that even customers running multi-zone architectures felt the impact.

Recovery is a temporary state too. According to Google’s timeline, power returned to the data halls at 08:20 London time, about 80 minutes after they lost power. But a large number of storage devices had shut down uncleanly and had to finish recovering first, so the team deliberately held back on restoring service, and the main impact lasted 6 hours and 8 minutes. Microsoft likewise said it chose to restore service in stages, validating stability at each step, which took longer.

Assumptions such as “the other two zones can absorb one zone’s traffic” or “once power is back, services come back” are estimates made in the normal state.

What this looks like in an ordinary company’s data centre

Imagine a company whose core database runs on a primary and a standby server. On Saturday night, the team takes the standby down to apply patches, planning to bring it back on Sunday morning. During that window, the monitoring screen still shows “high availability: enabled”, because that is a configuration value, not the current reality. The failover script is still there too; it is just that the server it would fail over to is rebooting. At 2 a.m. the primary’s storage controller fails. The on-call engineer follows the runbook and only then discovers that the runbook describes a world in which both servers are up.

Nobody in this scenario did anything wrong. Patching was right, keeping the failover script was right, following the runbook was right. What was missing was someone asking, before the maintenance began: from now until the standby is back, which protections are actually gone? Should other changes be paused during that window, should a second person be on call, or should some batch jobs simply be postponed?

A temporary state is part of the architecture and deserves its own review

When looking at a high-availability design, I think states such as “under maintenance”, “upgraded but not yet fully verified” and “just failed over” should sit alongside the normal state and be reviewed as part of the architecture. Each one has to answer the same questions: how much redundancy is left at this point, whether monitoring shows configuration or reality, and which state the runbook assumes.

Google’s remediation items go beyond fixing the controller logic. They include actually testing automatic generator start within the time the batteries can hold, and checking controller configurations at other sites with similar topologies. What these have in common is that they bring temporary states that had fallen outside the checks back inside them.

Architecture diagrams almost always show the normal state, because it is the easiest one to draw and the most persuasive. But every system spends some time off that diagram. Adding one field to a change request, “what is missing during this period”, costs very little. The harder part is getting an organisation to accept that during the week of maintenance, the system actually running is not the one in the slide deck.